52.5m3 Cryogenic LNG Semi Trailer Pressure-Built LNG Tanker Semi Trailer for City Gas Network
Products Description

Custom cryogenic LNG semi trailer designed for large LNG energy supply chain projects. Customized according to site working condition and local road regulation. High vacuum multi-layer insulation system with full safety interlock protection, adaptable to extreme hot, cold and salt spray environment. Optional integrated BOG recovery system, remote pressure & liquid level intelligent monitoring system for cross-border long haul LNG transport. Delivered with full ASME/ADR/DOT/GCC certification package.
Product Basic Parameters
|
Capacity (m³) |
52.5 |
|
Dimensions (mm) |
13300×2550×3920 |
|
Curb weight (Kg) |
15300 |
|
Working pressure (MPa) |
0.64 (Inner cylinder) |
|
Design pressure (MPa) |
0.64 (Inner cylinder) |
|
Filling rate |
90% |
|
Filling medium |
LNG |
|
Insulated form |
High vacuum multi-layer insulation |
|
Liquid discharge method |
Discharging liquid through pressure difference |
LNG Semi-Trailer Features
1.More pulling: 52.5 square tanks, effective loading of 24.6 tons, one trip to top the small tank twice
2.Good vacuum: imported adsorbent multi-layer aluminum foil winding, 15-30 days safety valve does not take off (fully loaded and standing)
3.Simple operation: the rear operation box is centrally arranged, the valve mark is clear, and the driver can get started in 10 minutes
4.Durable accessories: aluminum alloy wheels, LED lights, aluminum alloy side protection, light and rust-free
5.Brake safety: WABCO ABS, optional EBS tire pressure monitoring
LNG cryogenic semi trailer Advantages
Product: Project customized, redundant safety design, verified under extreme working condition; integrated intelligent monitoring & BOG recovery solution available.
Manufacturing: Own cryogenic pressure vessel license & ASME U stamp, project-based control, dedicated project engineer for each cryogenic LNG semi trailer.
Service: Full lifecycle project service: pre-project design & risk assessment; production inspection; witness test; on-site training; long-term maintenance & spare parts package. Oversea technical team on-site support available.
LNG transport semi trailer Application Scenarios
1.LNG point supply: supply gas to ceramic factories, glass factories, and food factories
2.Rehydration at gas filling stations: daily distribution at LNG filling stations
3.City gas: transportation at peak-shaving storage and distribution stations
4.City gas: transportation at peak-shaving storage and distribution stations
Packaging & Shipment


2+ units: Bulk vessel, deck lashing, save 30% on freight.
1 unit trial: 40HQ container, front axle/tyres removed, simple reassembly.
RORO: Available for Middle East/Africa routes, zero disassembly.
After Sales Service
1.Warranty: 12 months for whole cryogenic LNG semi trailer; 36 months for tank structure. Free spare parts for manufacturing defects within warranty.
2.7×24h online technical support via video, email and WhatsApp, quick troubleshooting for tank pressure, liquid level and valve issues.
3.Original spare parts global delivery, air freight available for urgent parts.
4.Oversea engineer on-site commissioning, operation training and periodic inspection available.
5.Complete O&M manual, operation guide, pressure vessel drawing, CO and full certification documents supplied.
6.Lifetime technical consultation, support tank annual inspection and vacuum recheck.
Troubleshooting about LNG transport semi trailer
| Problem | probable cause | Solution |
|---|---|---|
| Vacuum drops fast | Sandwich Leakage/Adsorbent Failure | Return to plant for vacuum/adsorbent replacement |
| relief valve take-off | Overloading/vacuum failure/external heat source | Check the filling rate, measure the vacuum degree, and avoid exposure to the sun |
| Incorrect reading of liquid level gauge | Differential pressure tube blockage/sensor fault | Blow the differential pressure pipe and replace the sensor |
|
emergency shut-off valve inactive |
Insufficient air source pressure/sealing aging |
Check the air path and replace the O-ring |
Why choose Us?


Direct price: direct supply from factories, no middlemen, lower than traders with the same configuration
Fast delivery time: standardized configuration 25 days line, no delay.
Export: Has been sent to Nigeria, Kenya, Saudi Arabia, Vietnam, Indonesia, familiar with the customs clearance requirements of each port.
Accessories with the car: Each unit is equipped with 1 set of wearing parts (safety valve sealing ring, liquid level gauge sealing gasket), which can be used immediately upon arrival at the port.
Customer Visit

Global customers are warmly welcomed to visit our factory. Book workshop tour: raw material inspection, tank welding, vacuum treatment, hydrostatic & air tightness test, whole trailer assembly. Witness cryogenic LNG semi trailer performance test on site. Factory reception, interpreter and live product demo available, project drawing discussion on site. Please book appointment 3~7 days in advance.
FAQ
Q: Can we arrange third-party inspection before shipment for cryogenic LNG semi trailer?
A: Fully acceptable. SGS/BV customer inspector welcome for factory inspection and witness test.
Q: What is service life of cryogenic LNG semi trailer with proper maintenance?
A: 15~20 years service life under regular maintenance.
Q: What is BOG for LNG transport trailer?
A: BOG is boil-off gas, low evaporation vacuum insulation design minimize BOG loss during transportation.
Q: Can you provide full project solution for LNG supply chain including cryogenic LNG semi trailer + BOG recovery system?
A: Yes, we provide integrated project solution including LNG tanker semi trailer design, BOG pipeline and intelligent monitoring system for large energy project.
Q: Can I visit your factory before ordering?
A: Absolutely. We welcome visits to our production line. We can arrange pickup from the nearest airport/high-speed rail station.
Hot Tags: 52.5m3 cryogenic lng semi trailer pressure-built lng tanker semi trailer for city gas network, China 52.5m3 cryogenic lng semi trailer pressure-built lng tanker semi trailer for city gas network manufacturers, suppliers, Lpg Simi Trailer Tank, semi trailer tank double wall design, semi trailer tank for industrial use, semi trailer tank for liquid nitrogen, semi trailer tank integrated system, semi trailer tank package system


